What We Do

Services

The full list of deck work we quote and build.

Home › Services

Everything we take on

Every job below is one we do ourselves across Wesley Chapel.

Deck Installation

We frame new decks on concrete footings poured below grade, sized for Florida's sandy soil rather than a one-size spec. Joists get hung with galvanized or stainless hangers rated for pressure-treated lumber, and we set board spacing for drainage and expansion before the first screw goes in.

Custom Deck Design

If you want a multi-level deck, a built-in bench, or a spot worked in for a hot tub, we draw it out and size the framing to carry that load. We'll show you the layout before any lumber is ordered so changes happen on paper, not mid-build.

Deck Repair

Soft or spongy boards usually mean water has been sitting instead of draining, and we replace those boards and check the joists underneath for rot before closing it back up. Loose railings almost always trace back to a post that was never through-bolted to the frame, and we fix that connection, not just tighten what's there.

Deck Staining & Sealing

We pressure wash first to strip old finish and mildew, let the wood dry fully, then apply a stain and sealer rated for UV and standing water. Skipping the dry time is why a lot of stain jobs peel within a year, so we don't rush that step.

Composite Decking Installation

Composite boards don't require staining, but they still require the right hidden fastener system and gap spacing so they don't buckle in the heat. We install brands rated for Florida sun, which matters because cheaper composite can fade or warp within a few summers here.

Deck Railing Installation & Repair

Florida code sets guardrail height and baluster spacing, usually gaps under four inches so a small child can't slip through. We build rail posts that bolt through the rim joist, not just screwed to the face board, which is the usual reason a railing starts to lean.

Pool Deck Construction

Pool decks need boards and hardware that handle constant splash and chlorine without corroding, so we steer people toward composite or marine-grade hardware in that zone. We also slope the framing slightly so water sheets off instead of pooling against the house.

Screened-In Deck & Lanai Construction

We frame the deck structure and coordinate the screen enclosure on top of it, sizing the posts to carry the extra wind load screening adds. That matters in a storm, since an enclosure that isn't tied into solid framing is the first thing to go.

Deck Resurfacing

When the frame underneath is still solid but the boards are cupped, splintered or just worn out, we pull the decking and replace just the boards, not the structure. It costs less than a full rebuild and usually takes a few days instead of a couple weeks.

Deck Demolition & Removal

Old decks get cut down section by section and hauled off, including any footings coming out for a new layout. We check what's underneath, ledger attachment and joist condition, before anyone assumes the new deck can reuse any of it.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Wesley Chapel, FL

Deck construction and repair across this part of Florida.

Wesley Chapel, FL
Tampa, FL
St. Petersburg, FL
Clearwater, FL
Brandon, FL
Spring Hill, FL
Lakeland, FL
Riverview, FL
Land O' Lakes, FL
Lutz, FL
Zephyrhills, FL
New Port Richey, FL
Common Questions

Things worth asking

Questions that come up once a project is underway.

Do I need a permit to build a deck in Florida?
Most decks over 30 inches off the ground, or any deck attached to the house, require a building permit in Pasco and Hillsborough County. The permit process includes inspections of the footings and framing before the decking boards go down, which protects the homeowner if the structure is ever questioned during a home sale.
How long does it take to build a deck?
A straightforward single-level deck usually takes one to two weeks from footing excavation to final board installation, weather permitting. Multi-level decks, screened enclosures, or custom features like built-in seating can add another week or two.
Can a deck be built on a fixed budget?
Pressure-treated pine keeps costs down while composite decking costs more upfront but requires less maintenance over time. Simplifying railing style, reducing stair count, or choosing a single level over multi-level framing are common ways to bring a design within budget.
Is there a warranty on deck construction work?
Workmanship on new deck construction and major repairs is typically covered for a set period after completion, and that coverage should be spelled out in the written quote before work begins. Material warranties on composite decking or hardware come separately from the manufacturer and are usually longer than the installer's workmanship warranty.
Who handles communication during the deck project, day to day?
On most deck jobs, the person who answers calls and the people building the deck are the same crew, which cuts down on miscommunication about changes or site access. Larger commercial deck projects sometimes involve a separate point of contact for scheduling.
What decking material is recommended for Florida homes?
Pressure-treated pine is the lowest upfront cost but requires re-staining every two to three years in Florida's sun and humidity. Composite decking costs more initially but resists fading, splintering, and rot, which matters most on decks that get full afternoon sun or pool splash.
Can the house still be used normally while a deck is being built?
Most deck construction doesn't require access to the interior of the house unless the ledger board attachment runs through an exterior wall near a window or door. Yard access near the work zone is limited for safety during framing and concrete work, but the rest of the property stays usable.
What needs to happen to the yard before deck construction starts?
Clearing furniture, grills, and potted plants away from the build area, and marking any sprinkler lines or buried cables in the yard, helps avoid delays once digging for footings starts. Anything attached to the existing structure, like a hot tub or old railing, should be flagged ahead of time so it's handled correctly during demo.
What if rot or damage turns up once the old deck is torn out?
Hidden rot in the ledger board, rim joist, or support posts is common on older decks and gets addressed before any new framing goes up, since building on a compromised structure just hides the problem. This kind of discovery usually comes with a cost adjustment, which gets explained and approved before the work continues.
How should a finished deck be maintained?
Pressure-treated wood decks require re-staining every two to three years in Florida's climate, with a pressure wash beforehand to strip mildew and old finish. Composite decking just requires periodic washing with soap and water, since it doesn't absorb water or require sealant the way wood does.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (352) 758-4161